Good afternoon all, as per the title, wondering what sort of lead times people have been seeing if they have opted for a factory build order rather than taking an in stock bike. Been told 3 months at present ( so similar to my present 1250 when it was ordered) Obviously BMW are presently pushing their finance/deposit contribution offer package till the end of the month but I presume this is mostly to shift existing 25 model year stock. TIA.
 
Good afternoon all, as per the title, wondering what sort of lead times people have been seeing if they have opted for a factory build order rather than taking an in stock bike. Been told 3 months at present ( so similar to my present 1250 when it was ordered) Obviously BMW are presently pushing their finance/deposit contribution offer package till the end of the month but I presume this is mostly to shift existing 25 model year stock. TIA.
If the dealer says 3 months then I would expect it to be probably about 3 months
 
Good afternoon all, as per the title, wondering what sort of lead times people have been seeing if they have opted for a factory build order rather than taking an in stock bike. Been told 3 months at present ( so similar to my present 1250 when it was ordered) Obviously BMW are presently pushing their finance/deposit contribution offer package till the end of the month but I presume this is mostly to shift existing 25 model year stock. TIA.
how long is a piece of string

4 months and counting so far - twice made another spec other than whats on the order form

mate waited 5 months for a car - rang him up 3 months in and said give us £500 quid your getting x - to which he said no I'm not, make it properly or go away - it was only 75k so why would you expect what you want - its german
 
I ordered my GS in the 3rd week of July. Factory 26MY build as my spec wasnt in the UK, dealers get it today I think and I will collect next week. So thats about 10 weeks from order and thats allowing for summer holidays at the factory.
 