Hello you fellows,
As the airhead comes together I thought I'd bore one and all with some photos....
This is how it started back in March, via the Proff delivery service....
I had intended to bimble around on it for the summer and then do the 'winter project' thing. Then it failed its MOT (badly
) and I found a bunch of this:
.....so decided to do the 'summer project' thing instead, hell why not? Which was fine, as the weather has been rubbish.
So out came the spanners, and we started doing some of this:
....and found more of this:
Decided to rebuild this:
The bike has been stood for some time, so I chickened out of the big stuff, and took the engine and gearbox for rebuilding to a BMW airhead specialist. The final list included, amongst other things:
- valves and guides
- 5th gear
- main seal
- clutch
- 2nd hand barrel (corroded nicasil (sp?) coating)
- timing chain and adjuster
- rings
All this stuff went for blasting and powder coat:
Frame needed a repair first to get rid of this gopping side stand mount:
For a while I had nothing in the garage while everything was with other peeps getting worked on, then bit-by-bit it started coming back.....
Ooooooohhhhh yes......
And now the rebuild starts....
Current state, otherwise known as 'expensive wheelbarrow'
Most difficult jobs so far:
- taking apart: getting those dang engine mounts out (thank you Proff and Rob)
- rebuilding: re-attaching the driveshaft to the gearbox and refitting the gaiter
More pics to follow as the build continues....

As the airhead comes together I thought I'd bore one and all with some photos....
This is how it started back in March, via the Proff delivery service....


I had intended to bimble around on it for the summer and then do the 'winter project' thing. Then it failed its MOT (badly


.....so decided to do the 'summer project' thing instead, hell why not? Which was fine, as the weather has been rubbish.
So out came the spanners, and we started doing some of this:

....and found more of this:

Decided to rebuild this:

The bike has been stood for some time, so I chickened out of the big stuff, and took the engine and gearbox for rebuilding to a BMW airhead specialist. The final list included, amongst other things:
- valves and guides
- 5th gear
- main seal
- clutch
- 2nd hand barrel (corroded nicasil (sp?) coating)
- timing chain and adjuster
- rings
All this stuff went for blasting and powder coat:

Frame needed a repair first to get rid of this gopping side stand mount:

For a while I had nothing in the garage while everything was with other peeps getting worked on, then bit-by-bit it started coming back.....


Ooooooohhhhh yes......

And now the rebuild starts....

Current state, otherwise known as 'expensive wheelbarrow'


Most difficult jobs so far:
- taking apart: getting those dang engine mounts out (thank you Proff and Rob)
- rebuilding: re-attaching the driveshaft to the gearbox and refitting the gaiter

More pics to follow as the build continues....