Today saw quite a lot of jobs completed and ticked off the 'to-do' list...
#1 - First thing I got both out the garage for a quick pic before taking the 650 out for a spin.
Mid-afternoon onwards saw off many of the outstanding 'niff-naff' jobs inc. applying copper-slip or silicone grease or threadlock; to nuts, bolts and fastners as-required. With the side-fairing and rear panels removed (again) I got down to installing some parts that were only temp-installed the other day...
#2 - The silencer got heat-resistant silicone applied to the swivel joint, then torqued up
#3 - The Scottoiler was (finally) reinstalled.....
#4 - ....with the oil pipe being routed alongside the braided brake hose, both inside some cable-wrap to keep them tidy (yes, I know there's some wee touch-ups to do

)
#5 - The main wiring harness on the RHS adjacent to the battery tray had been bugging me for a while...
#6 - ...so all the old electrical tape and other wrappings got stripped out and replaced
#7 - The front brake-hose guides on both sides needed a bit of modifying to correctly take the braided hoses; so that got done...
#8 - ...alongside a general brake service and calliper clean-up
Not too much left to do now, which is nice!
