So the list is as follows but is not finalised
Front wheel - hubs, rims need repainting. Bearings replaced. Calipers rebuilt. Discs replaced.
Front supension, forks - seals replaced. Steering head bearing replaced. wishbone seals and bearing replaced. New clutch cable.New clutch slave cylinder, pushrod, felt pad thingy, gasket.
Various output input seals
HES , Alternator starter motor coil all need to be checked.
Fuel tank- fuel pump pipe work. filter. all new quick release fuel connectors. inside of tank checked.
Wiring loom protective cover is broken so replace same.
Ugrade headlight bulbs, bar risers,lowered footpegs.
Gearbox /Transmission - new clutch, replace bearings in final drive check boots re grease etc. new pivot pins.
Re drill re tap the following front frame where two crashbar studs snapped. 4 cylinder studs. rear grab rail plate.
Drill out all 4 footpeg mounting bolts yep tried heat 50/50 ATF /Acetone swearing hammering etc
For dipping / bead blasting/ spraying - subframe, telelever bracket , steering bridge, cylinder heads, rear grab rail and plate, probably wheels. handlebars, top of clutch and brake master reservoirs.
Seat recovered.
I'm sure there is more