IJGser
Registered user
After a long winter the project is finally starting to come together and the first finished fabrication (excluding last years rack) has arrived the bash plate 
What do you think
This is how she started out in January 2012 phase one, to become mechanically sound.
Put back together but still cosmetically and practically standard
she passed the reliability tests with flying colours completing loads of lanes and a little rallying.
until the first 'long trip' when the feeble front shocks rebound failed and the seat reduced me to a uncomfortable whimpering girl
Loaded up like a pack horse travelling through spain i had the vision
Who needs the GS or a fast bike, on a small budget i could make this into my own specific duel sport bike. The GS was sold and the planing began
No following the crowd or off the shelf and all within a sensible budget.
If it looked shit who cares, my specific use is the objective
Heres a taster
More to follow
Ian

What do you think

This is how she started out in January 2012 phase one, to become mechanically sound.
Put back together but still cosmetically and practically standard
she passed the reliability tests with flying colours completing loads of lanes and a little rallying.

until the first 'long trip' when the feeble front shocks rebound failed and the seat reduced me to a uncomfortable whimpering girl

Loaded up like a pack horse travelling through spain i had the vision
Who needs the GS or a fast bike, on a small budget i could make this into my own specific duel sport bike. The GS was sold and the planing began
No following the crowd or off the shelf and all within a sensible budget.If it looked shit who cares, my specific use is the objective

Heres a taster
More to follow

Ian



and surprisingly i think it has potential not to look like a garden shed pig build 





