The gearbox was stripped and found to be full of water!!!, so 3rd and 4th gear had to be replaced along with the new higher 5th.All bearings and seals were also replaced along with a good old vaqua blast. It looked like new when it cameback from Moorespeed. The engine was stripped and blasted and the spec was discussed and agreed with Richie Moore.The plan was always to have a full spec Mooresped engine, I just needed to choose my spec.
The crank was lightened and balanced, I got a set of siebenrock barrels and Moorespeed designed Omega 1000cc pistons, ( Omega make the pistons for the MotoGP Ducati) we specc'd a sport cam,Moorespeed modded airbox, 40mm carbs and a late GS heads which have had 46mm inlet valves fitted and a good gas flowing.
The clutch needed more beef as Moorespeed were finding that even with new OE clutches and beefier springs,they were slipping in 4th and 5th on full throttle.Richie has had a batch made up by Sachs with replacable material,so one for me please.
The cam chain and all other engine internals have been replaced including starter,doide board etc,etc.