/6
Looks suspiciously like my 1974 R75/6 which is in a later stage of nearing an expensive reassemble.
Engine had to be cut from frame and front engine mounting bolt drilled out.
Clutch needed replaced.
Tank, bikini fairing, mudguards and side panels with one painter. Should re ready in 2 weeks.
Frame, swinging arm, stands with another painter. Should be ready in 3 weeks.
Cylinder head exhaust guides and seats being worked on. Should ready next week.
Waiting on gudgeon pins which are in the post.
Battery box for powder coating, and chrome to be rechromed.
A work in porgress.