R80TIC Winter Project

Thanks Mike that all looks great…..
The frame is still at the painters, so no real progress here. The carb bodies are with Mike for vapour blasting. The forks and brake caliper are done.
 

Attachments

  • 20240102_170109.jpeg
    20240102_170109.jpeg
    218.6 KB · Views: 75
  • 20240102_170201.jpeg
    20240102_170201.jpeg
    182 KB · Views: 88
Thanks Mike that all looks great…..
The frame is still at the painters, so no real progress here. The carb bodies are with Mike for vapour blasting. The forks and brake caliper are done.
This is coming together fast! Looks good
 
Thanks Mike that all looks great…..
The frame is still at the painters, so no real progress here. The carb bodies are with Mike for vapour blasting. The forks and brake caliper are done.
Those muffin trays are useful aren't they? So much more professional than an eggbox...
 
This is a loan bike that I’m using to get the high level exhaust made, this is going to take 4 weeks or so. I’ve fitted the airbox and starter motor covers, tank, seat and a Hi level front mudguard. This gives Andy the exact clearances for the new exhaust. Using the spare bike allows me to continue on the actual bike while the exhaust is being made.
 

Attachments

  • 20240108_161333_Original.jpeg
    20240108_161333_Original.jpeg
    189.9 KB · Views: 58
  • 20240108_161847_Original.jpeg
    20240108_161847_Original.jpeg
    146.6 KB · Views: 58
Be interested in how the high level exhaust work out……singed knackers ahead 😂
 


Back
Top Bottom