Hello Folks.
Due to maintenance work required, the Allt Y Badi has had an 18 month TRO imposed.
Resurfacing and drainage repairs are in the scope of works.
There is a pressure group of NIMBYs leaning on Denbighshire County Council to close this ancient route.
Please feel free to contact the Highways Dept of Denbighshire County Council, asking them about the repairs, the length of time of the TRO and your interest in the reopening of the route as a County Road.
Be sure to include your full name and address.
[email protected]
There must be at least a hundred riders on this site that have used this lane, please help to preserve it's status on the map.
Thanks.
Timpo.
PS. I have posted this on the end of one of the best GS-ing threads about the Allt......
Due to maintenance work required, the Allt Y Badi has had an 18 month TRO imposed.
Resurfacing and drainage repairs are in the scope of works.
There is a pressure group of NIMBYs leaning on Denbighshire County Council to close this ancient route.
Please feel free to contact the Highways Dept of Denbighshire County Council, asking them about the repairs, the length of time of the TRO and your interest in the reopening of the route as a County Road.
Be sure to include your full name and address.
[email protected]
There must be at least a hundred riders on this site that have used this lane, please help to preserve it's status on the map.
Thanks.
Timpo.
PS. I have posted this on the end of one of the best GS-ing threads about the Allt......
and which I went arse over tit? If so it deserves an email...