yes DPC is under full slab and up over edges
when being doing drawing led believe the shed be fitted on a sealant or gasket of some sort.
they since said drawing is wrong and DPC should bee wrapped over slab and cut flush inside shed. but this is crap, as still means moisture get in under shed. also DPC breaks down int he sun so it would one work for 1-2 year max
been onto few builders and all say shim it up, felt under it and then drop it back down on felt and if want run bead mastic alone felt to seal it fully. so run 3" strip of felt in under frame. then a 12" strip onto an creates a gentle slope away from shed
then fold the rest of the 12" strip torch on felt over slab over lapping my DPC
Then paint with silver sealing paint used for roof gullies and have permanent fully sealed shed.
anyway its covered in show and freezing, bot 1 drop condensation and with so much sunlight coming in its still lot warmer inside with no heating. bit damp at edges but once gt few dry spells ill fix it with felt as dad and fatherinlaw were builders in past life so said will come up and 2-3hrs will have sealed in