Took the bumble for the MOT on Saturday and all is well. I am now on the road!
List of jobs done since getting her:
1) Rear shock replaced with Fournales (wonderful piece of kit).
2) Rotten downpipes replaced with Keihan.
3) Rear subframe powder coated and reinstalled.
4) battery box painted and reinstalled.
5) Neutral light switch replaced.
6) Oil and filter change.
7) Starter motor overhauled.
8) Replacement Keihan silencer fitted (to make a complete system).
9) MOT obtained.
Next jobs include getting a few bits resprayed and tidied, and finishing fitting the stainless kit supplied by Chris Shaw.
Anyone want to buy it off me? Looking rather nice now. I will take some piccies when the weather is a bit kinder
List of jobs done since getting her:
1) Rear shock replaced with Fournales (wonderful piece of kit).
2) Rotten downpipes replaced with Keihan.
3) Rear subframe powder coated and reinstalled.
4) battery box painted and reinstalled.
5) Neutral light switch replaced.
6) Oil and filter change.
7) Starter motor overhauled.
8) Replacement Keihan silencer fitted (to make a complete system).
9) MOT obtained.
Next jobs include getting a few bits resprayed and tidied, and finishing fitting the stainless kit supplied by Chris Shaw.
Anyone want to buy it off me? Looking rather nice now. I will take some piccies when the weather is a bit kinder
mine is back together but needs a battery. probably best to keep it away from the salt anyway 
