- Joined
- Jul 14, 2010
- Messages
- 10,399
- Reaction score
- 3,653
I take no credit for the above workmanship.A beautiful weld.....
It’s fairly well known that my grinding skills far outweigh my welding skills
I take no credit for the above workmanship.A beautiful weld.....
Lovely work Mike!
Proper engineering job refurbishing that. Top marks!
I collected the blue tank from Andy after I had looked at the exhaust. Then refitted it to my bike to check the electrics fitted under the tank…..just checking that you are paying attention.That's one set of confusing photos.
I think I've worked it out now!
That’s going to be a great bike ColinI managed to get a complete rear wheel from Germany, stripped that, and gave the hub to Mikey for a quick clean up. So both hubs are off, with some new Borrani rims, to be re built.
The electrics are all done with the exception of the connections from the Acewell to the G/S harness and the RH switch gear. I’ve had to change my plans for the RH switches. The ignition is now going to be fitted into the starter motor cover and not in the headlight, so I thought a kill switch on the handlebar would be a good addition.

What a lovely little exhaust. Go well on my outfit !!Popped over to Andy’s today to collect the exhaust. Managed to get it fitted to the actual bike, very happy with the finished result.